Gloucestershire Cricket Club

We teamed up with Select Switchgear to partner with D&H Group to provide a dedicated switch electrical panel solution.

Test

Gloucestershire Cricket Club | Energy Distribution

The electrical switch panel was specifically installed to run the floodlight columns only and was designed to provide circuit protection and switching for the columns.

 

We together with switch panel partner, Select Switchgear have teamed up with D&H Group to provide a dedicated switch panel solution to control six, 45-metre high floodlight columns installed at one of English cricket’s most famous grounds.

 

The Bristol County Ground, home of Gloucestershire County Cricket Club since 1870, is now clearly illuminated by 432 metal halide light fixtures to meet the night cricket lighting demands of the English Cricket Board, as well as the stipulations set down by the International Cricket Council for appropriate playing conditions if playing cricket after dark.


"I always specify Hager products as I know I can rely on them totally."

D & H Group 


The project, which was completed in readiness for the 2016 season, was a collaborative effort under the overall direction from D&H Group.

 

D&H Group say: “I have a long standing and strong relationship with Hager and its switch panel partner, Select Switchgear. Tasked with finding a switch panel solution to work alongside the installation of six new floodlight columns, it was a straightforward decision to specify the panel from this source as I knew the standard of the work and professionalism of the team would be extremely helpful on a major project of this type.”

 

The switch panel was specifically installed to run the floodlight columns only and was designed to provide circuit protection and switching for the columns. There are twelve integral switches within the panel, with two switches included for each individual floodlight column.

 

D&H Group continues: “There were a couple of small issues at the outset, but the technical support team were quickly on site to ensure that they were resolved without delay, after which the installation of the switch panel and the floodlights was highly successful.

 

After being let down by another supplier on a previous project and then working with Jason Pritchard (Our Key Accounts Manager) on other subsequent jobs, I have found them to be an ideal partner, so we continue to work with them on projects that require the manufacture of Switchgear since then. I always specify Hager products as I know I can rely upon them totally.”

The switch panel was delivered to site in three sections. The onsite civil engineers created a base for the panel’s final location which allowed the electrical team to bring up their cables from the bottom of the panel. Each section of the panel was then lifted into place by using a forklift truck. The panel was loosely bolted together, following which the Select team came to site to finally commission the panel. There are twenty final circuits feeding the floodlight columns which were brought into the bottom of the panel and terminated into the contactors.

 

The success of the installation was down to teamwork, as D&H Group concludes: “Installing an international cricket venue floodlight solution is not without its challenges. But in this case, thankfully the switch panel was not one. To have the expert Select team at the end of the phone, together with the service and performance reliability we get from Hager technology, made for a great combination, and was instrumental in ensuring this part of the project was seamless.”




Products used in this case study

Get inspired and discover how you can use our products in your next project! 

test

Invicta Panel Board

The invicta 3 panelboard range includes 250A, 400A, 630A & 800A panelboards with MCCB incomers. Prewired meter packs allow installers to fit metering into the board. All the internal wiring is included. Installation is fast and simple, thanks to a number of features. 



Discover
similar case studies

Enjoyed what you read? Check out some more of our other case studies to see how we were able to provide an ideal electrical solution.

test

The King Edmund School | Hager Energy Monitoring Solution

Leading electrical solutions and services provider, Hager, has worked with Gainsborough Electrical contractors to install an energy monitoring solution at King Edmund School in Essex that will enable detailed reporting and manage energy consumption. 

test

David Wilson Homes | Hager Energy Distribution Board

David Wilson turned to Hager to ensure that they had an 18th edition compliant and high quality solution for their new 17,000 home development. 

test

Dundee University | Hager Lighting Connection System

Needing a fast and adaptable lighting Control System, McGills Electrical installed Hager’s Tebis KNX bus based system throughout the new library extension in the University of Dundee.