Facebook Data Centre
What an enormous facility! The entire campus covers 250 hectares.
An energy saving lighting control project for a data centre
The Facebook data centre predominantly consists of main computer rooms and offices, all of which were fitted with dimmable lights. Mercury Engineering required a lighting solution for wiring all the DALI fittings throughout the numerous data halls, and office spaces that occupy the building. Hager presented the Klik solution customising the cable length to match the specifications of the project.
Hager’s Klik range is a solution for any lighting design scenario. The Klik offer allows for automatic lighting control that provides energy savings by not operating when there are sufficient light levels present. With a range of settings for daylight linked dimming, occupancy sensing and DALI control, Klik was an ideal lighting solution for the Facebook Data Centre project.
Project details
Details:
Project: Facebook Data Centre
Location: Clonee, Co. Meath
Electrical Installation: Mercury Engineering
Panel Builder: M&L Dundalk (sub panels) and ENI Donegal (main panels)
Distributor: National Electrical Wholesale, Dublin
www.hager.ie
Built-in Hager Solutions:
Hager Klik System
Hager Dali Sensors
Project
solutions
Want to see more?
Discover our other outstanding references.
Learn more about Hager
Providing the solutions you require with the support you deserve!
Contact us
Want to discuss your next project requirements with us? Get in touch here and we'll get back to you shortly.









