25. November 2026
MEP Paris: balancing energy efficiency and collection care
Photographic collections require stable temperature and humidity conditions, making energy savings in museums particularly challenging. At the Maison Européenne de la Photographie (MEP) in Paris, Hager is addressing this challenge through its energy management expertise in buildings. Together with SCC France, Eficia by Hager is helping the City of Paris modernise the museum’s building management system (BMS) while maintaining the conditions required to protect these precious collections.
A museum where every degree counts
The MEP is one of Paris’s museums dedicated to photography. Its collections, both on display and in storage, depend on stable environmental conditions. At the same time, the City of Paris has set ambitious energy targets for its cultural buildings. The MEP has nearly reached its 2030 target under France’s tertiary-sector energy decree and aims to meet its 2040 target by the end of 2027.
However, the museum’s existing BMS was no longer meeting operational needs. The City needed a reliable solution to manage the building, monitor energy consumption and identify technical faults. This is where Eficia by Hager came in.
- Caroline Miller, General Administrator at MEP

A tailored solution, backed by continuous support
Rather than simply replacing outdated equipment, the City wanted a solution tailored to the specific needs of the site.
The project is delivered by Eficia by Hager in collaboration with SCC France, a major digital services provider, through UGAP, France’s central public purchasing body. SCC France coordinates the project, Eficia by Hager contributes its expertise in building automation and energy management, modernising and optimising the existing BMS with local automation and real-time remote monitoring.
The service also includes:
- 24/7 monitoring and on-call support
- Continuous fault and alarm reporting
- Regular in-depth reviews of building operations
- Expert recommendations to optimise energy consumption
All of this helps maintain visitor comfort and the conditions required to preserve the collections. The City also values the close working relationship between the teams, including a dedicated SCC project manager and an Eficia site lead, as well as their responsiveness and technical expertise.
“Thanks to the good collaboration between the local teams and Eficia by Hager, we were able to achieve our objectives and complete the BMS installation.”
- Jérémie Folliot, BMS Project Manager at Eficia by Hager

A pilot project for cultural buildings in Paris
The MEP is the first project of its kind for the City of Paris, and feedback has been positive since the system was deployed. Its significance extends beyond the museum: around ten of the City’s cultural buildings are already subject to the French BACS requirements for building automation and control systems. Around twenty more will be covered from January 1st, 2030.
“The project at the MEP has exemplary value. It is a test phase, and if the feedback is positive, it will lead to other projects.”
- Laurent Chaventon, Cultural Building Service of the City of Paris

